Upgraded stationary seats to solid Tungsten Carbide from Chrome Oxide coated parts. Replaced rotary seal Teflon wedges with o’ring design. Unit was repaired under emergency basis due to end user production requirements. Job turned around in (4) working days.
3.00″ Double Lightnin Mechaincal Seal needs repair.
Double Lightnin Seal repaired by Robco of America.
Double Lightnin Seal repaired by Robco of America.
Double Lightnin Seal repaired by Robco of America.